최신VMware Advanced Design VMware Cloud Management and Automation - 3V0-32.21무료샘플문제

문제1
An organization has a set of requirements for its private cloud:
Provide the ability to reclaim idle VMs deployed in vRealize Automation (vRA) Report on the health of resources provisioned in vRA Calculate the cost of VMs provisioned in vRA Optimally place vRA deployment workloads to vSAN and avoid contention Which cloud management product should be integrated with vRA to meet these requirements?

정답: D
문제2
When designing a load-balanced vRealize Operations cluster, which three aspects should an architect consider? (Choose three.)

정답: B,D,E
문제3
An architect is tasked with the following:
Build a private cloud solution for an organization using VMware vRealize Automation.
This private cloud needs to manage two different datacenters separated geographically.
The private cloud solution needs to be highly available.
Which of the following approaches can the architect take to achieve this?
Note: VMware Identity Manager has been renamed as VMware Workspace ONE Access.

정답: A
문제4
Which two statements are true when considering the vRealize Automation logical design for workload storage placement based on service levels, cost, and performance? (Choose two.)

정답: A,B
문제5
A customer wants to design and deploy Workspace ONE Access to provide multi-tenancy for vRA 8.x deployment.
Which two designs decisions would achieve the customer's requirement? (Choose two.) Note: SAN stands for Subject Alternative Name.

정답: B,D
문제6
An architect is responsible for creating the design for a Cloud Monitoring solution that will be used to monitor a greenfield VMware Software-Defined Data Center (SDDC). During a requirements gathering workshop, the Service Owner provided a list of solution requirements:
The solution must support a monthly availability target of 99.9%.
The solution must support the monitoring of 1000 virtual machines across two data center locations.
The solution must support the retention of live data for at least 12 months.
The solution must be redundant to a minimum of N + 1 including during planned maintenance.
The Recovery Time Objective (RTO) of solution is 4 hours.
Given the information from the Service Owner, which two statements would be considered functional requirements? (Choose two.)

정답: B,C
문제7
A company is planning to deploy a new cloud management solution that will allow business users to deploy servers via a self-service portal. After the initial discovery workshop with the new service owner, the architect has gained the following key information about the project:
In an effort to increase user experience, the IT Manager has requested that all deployments do not rely on manual approvals.
The current IT team is made up of five engineers but only one engineer has any experience writing scripts or automating server deployments.
The current version of the CMDB solution has no API available to create or destroy configuration items (CI) and there is no budget for upgrades.
Currently all CMDB activities are completed manually via service request with an SLA of 4 hours.
The customer has one data center with a requirement of protection against data center failure.
The expected availability SLA (measured monthly) will be 99.5%.
The deployment of a server is expected to take no longer than 2 hours.
Given the information provided, which two risks should the architect document within the design? (Choose two.)

정답: A,C

KoreaDumps의 제품으로 GO GO GO !

자격증의 중요성:

경쟁율이 심한 IT시대에 인증시험을 패스함으로 IT업계 관련 직종에 종사하고자 하는 분들에게는 아주 큰 가산점이 될수 있고 자신만의 위치를 보장할수 있으며 더욱이는 한층 업된 삶을 누릴수 있을수도 있습니다.

KoreaDumps 제품의 가치:

KoreaDumps에는 IT인증시험의 최신 학습가이드가 있습니다. KoreaDumps의 IT전문가들이 자신만의 경험과 끊임없는 노력으로 최고의 학습자료를 작성해 여러분들이 시험에서 패스하도록 도와드립니다.

무료샘플 받아보기:

관심있는 인증시험과목 덤프의 무료샘플을 원하신다면 덤프구매사이트의 PDF Version Demo 버튼을 클릭하고 메일주소를 입력하시면 바로 다운받아 덤프의 일부분 문제를 체험해 보실수 있습니다.

완벽한 서비스 제공:

KoreaDumps는 한국어로 온라인상담과 메일상담을 받습니다. 덤프구매후 일년동안 무료 업데이트 서비스를 제공해드리며 구매일로 부터 60일내에 시험에서 떨어지는 경우 덤프비용 전액을 환불해드려 고객님의 부담을 덜어드립니다.