최신NCARB ARE 5.0 Project Planning & Design (PPD) - Project-Planning-Design무료샘플문제

문제1
Examples of regulatory controls include which of the following elements? Check the four that apply.

정답: A,B,C,D
설명: (KoreaDumps 회원만 볼 수 있음)
문제2
Which of the following types of heating system would be appropriate when the design requires a very compact system that has a low initial cost, is easily zoned, and has a quick response to temperature changes?

정답: D
설명: (KoreaDumps 회원만 볼 수 있음)
문제3
An architect is developing a master plan for a small area of a city located on a lake. The master plan has four open sites being considered for a proposed park. The city needs to avoid incoming noise pollution at the park and provide a variety of activities for the city.
Click on the open site that is appropriate for a city park with baseball fields and nature trails.
정답:

Explanation:
open site directly adjacent to the industrial zone
It is away from the airport noise to the west.
It is separated from the residential low-rise and waterfront areas, reducing impact on sensitive neighbors.
It provides enough space and separation from commercial and retail zones (right map).
It avoids the smaller open sites on the waterfront and retail area, which are constrained and may be affected by residential noise concerns or limited in size.
문제4
An architect has just received client approval of the Schematic Design documents for a three-story, outpatient medical clinic. The clinic is located within a mixed-use development governed by a City-approved Planned Development (PD) document. The medical clinic design utilizes standardized departmental layouts and includes outpatient clinics, as well as treatment spaces, administrative spaces and public/lobby spaces.
The site needs to accommodate four different vehicular traffic flows: patient traffic, staff traffic, service and delivery traffic, and emergency services traffic. In addition, a pedestrian plaza must connect to the mixed-use development sidewalks. The plaza must provide space for bicycle parking and will serve as the future bus stop.
The site design addresses several challenges related to building orientation. The southeast facade, with excellent visibility from the highway, is the location of all service equipment. The building entrance faces northwest, convenient to the parking but not visible from the highway.
The client believes future patient volumes will outgrow the clinic. The PD document allows for a planned Phase 2 development on the adjacent vacant site to the southwest. Phase 2 would include a second building (2 story, 80,000 BGSF) and/or a parking deck.
Other considerations for the project include:
* Protected tree requirements are defined in the PD document.
* Easy pedestrian access must be provided from Sycamore Boulevard.
* All required parking for the clinic must be accommodated on site.
* Programmed area includes 109,450 Departmental Gross Square Feet (DGSF) / 130,184 Building Gross Square Feet (BGSF).
* Exterior material percentages are dictated by the PD document and shall not exceed specific percentages for Primary and Secondary Finishes.
* All service equipment needs to be screened; see PD document for restrictions.
* Signage opportunities are important to the client.
* Acoustical privacy is a concern of the healthcare system.
The following resources are available for your reference:
* Drawings, including a perspective, plans, and exterior elevations
* Building Program, including client's departmental program and detailed program for Treatment 01 (Infusion)
* Exterior Material Cost Comparisons
* Planned Development Document
* IBC Excerpts, showing relevant code sections
* ADA Excerpts, showing relevant sections from the ADA Standards for Accessible Design The architect and civil engineer are coordinating the design of the proposed pedestrian plaza fronting along Sycamore Boulevard and reviewing estimates for the cost of street trees. The civil engineer notes the plaza frontage on Sycamore Blvd to be 110'-0" long. Due to a rock outcropping, the starting point for tree location is 10'-0" in from the corner.
The landscape regulations of the planned development and the street tree cost estimates are as follows:
* 'Cathedral' Live Oak: $250 per tree
* Allee Elm: $200 per tree
* American Holly: $125 per tree
What is the minimum cost for street trees along the frontage described?

정답: C
설명: (KoreaDumps 회원만 볼 수 있음)
문제5
Which of the following are characteristics of heavy-timber construction? Check the four that apply.

정답: B,C,D,F
설명: (KoreaDumps 회원만 볼 수 있음)
문제6
In the design of a project, the architect should do which of the following in order to respond to the requirements imposed by governmental authorities that have jurisdiction over the project?

정답: D
설명: (KoreaDumps 회원만 볼 수 있음)
문제7
What is the primary benefit of underground detention with controlled discharge to a waterway?

정답: B
설명: (KoreaDumps 회원만 볼 수 있음)
문제8
Click in the structural bay of the elevation that is the most appropriate location to install steel rod cross bracing.
정답:

Explanation:
the most appropriate location to install steel rod cross bracing is in the fourth structural bay, which corresponds to the bay on the far right side of the elevation.
* Steel rod cross bracing is typically installed in bays that are fully open or contain large door openings and require lateral support to resist racking forces (lateral loads such as wind or seismic forces).
* The fourth bay shows a large door opening without any visible solid wall or shear wall elements, making it structurally weaker against lateral loads and thus the most suitable for cross bracing.
* The first bay, with a smaller door or solid wall, and the other bays with more enclosed or glazed openings may have other structural elements providing lateral resistance.
* Installing the bracing in the fourth bay enhances structural stability and prevents lateral displacement or deformation.
문제9

Refer to the exhibit (graph of moving walkway speed vs. nominal passengers per hour).
Based on the graphic shown, which of the following moving walkway speeds will deliver 4,500 passengers per hour utilizing a single lane?

정답: C
설명: (KoreaDumps 회원만 볼 수 있음)
문제10
An architect is designing a mixed-use building and must provide fire separation between the various use types.
Which properties must be considered to meet the fire separation requirements? Check the three that apply.

정답: B,D,E
설명: (KoreaDumps 회원만 볼 수 있음)

KoreaDumps의 제품으로 GO GO GO !

자격증의 중요성:

경쟁율이 심한 IT시대에 인증시험을 패스함으로 IT업계 관련 직종에 종사하고자 하는 분들에게는 아주 큰 가산점이 될수 있고 자신만의 위치를 보장할수 있으며 더욱이는 한층 업된 삶을 누릴수 있을수도 있습니다.

KoreaDumps 제품의 가치:

KoreaDumps에는 IT인증시험의 최신 학습가이드가 있습니다. KoreaDumps의 IT전문가들이 자신만의 경험과 끊임없는 노력으로 최고의 학습자료를 작성해 여러분들이 시험에서 패스하도록 도와드립니다.

무료샘플 받아보기:

관심있는 인증시험과목 덤프의 무료샘플을 원하신다면 덤프구매사이트의 PDF Version Demo 버튼을 클릭하고 메일주소를 입력하시면 바로 다운받아 덤프의 일부분 문제를 체험해 보실수 있습니다.

완벽한 서비스 제공:

KoreaDumps는 한국어로 온라인상담과 메일상담을 받습니다. 덤프구매후 일년동안 무료 업데이트 서비스를 제공해드리며 구매일로 부터 60일내에 시험에서 떨어지는 경우 덤프비용 전액을 환불해드려 고객님의 부담을 덜어드립니다.