With vendor managed inventory, a supplier must obtain which of the following data from the customer to ensure high service levels?
With vendor managed inventory, a supplier must obtain which of the following data from the customer to ensure high service levels?
정답: B
문제2
Which of the following methods is used to sequence jobs planned for production within the same time period?
Which of the following methods is used to sequence jobs planned for production within the same time period?
정답: D
문제3
A company is gathering data as to why the machine is consistently shutting down. What methodology should a company pursue first?
A company is gathering data as to why the machine is consistently shutting down. What methodology should a company pursue first?
정답: B
문제4
Which of the following factors should have the greatest influence on an operation's choice of new equipment?
Which of the following factors should have the greatest influence on an operation's choice of new equipment?
정답: B
문제5
A company has successfully completed improvement projects in several business units. Which of the following breakthroughs would be achieved when the improvements are embedded into the entire organization?
A company has successfully completed improvement projects in several business units. Which of the following breakthroughs would be achieved when the improvements are embedded into the entire organization?
정답: D
문제6
Mixed-model scheduling results in which of the following benefits:
Mixed-model scheduling results in which of the following benefits:
정답: C
문제7
A company produces a part with a nominal diameter of 2.0 inches and a tolerance of +-
0.006
with a standard deviation of 0.001 inches. A sample has the average diameter of
1.996
inches with a standard deviation of 0.001 inches. What is the CPK and process capability?
A company produces a part with a nominal diameter of 2.0 inches and a tolerance of +-
0.006
with a standard deviation of 0.001 inches. A sample has the average diameter of
1.996
inches with a standard deviation of 0.001 inches. What is the CPK and process capability?
정답: D
문제8
Changes in the order quantity result from changes in: