문제1
What stage of LEED for Neighborhood Development certification listed below is eligible for points under Building Design and Construction: New Construction, Location and Transportation Credit, LEED for Neighborhood Development Location?
What stage of LEED for Neighborhood Development certification listed below is eligible for points under Building Design and Construction: New Construction, Location and Transportation Credit, LEED for Neighborhood Development Location?
정답: D
설명: (KoreaDumps 회원만 볼 수 있음)
문제2
A commercial office building with a footprint of 70,000 ft2 (6 503.2 m2) has an overall site area of 200,000 ft2 (18 580.6 m2). The project design includes 15,000 ft2 (1 393.5 m2) of pedestrian oriented hardscape and 18,000 ft2 (1 672.3 m2) of vegetated open space. Which of the following is necessary to satisfy the requirement for the outdoor space to be physically accessible when calculating the Sustainable Sites Credit, Open Space?
A commercial office building with a footprint of 70,000 ft2 (6 503.2 m2) has an overall site area of 200,000 ft2 (18 580.6 m2). The project design includes 15,000 ft2 (1 393.5 m2) of pedestrian oriented hardscape and 18,000 ft2 (1 672.3 m2) of vegetated open space. Which of the following is necessary to satisfy the requirement for the outdoor space to be physically accessible when calculating the Sustainable Sites Credit, Open Space?
정답: A
설명: (KoreaDumps 회원만 볼 수 있음)
문제3
Which strategy can maximize the efficiency of water use in an irrigation system?
Which strategy can maximize the efficiency of water use in an irrigation system?
정답: A
설명: (KoreaDumps 회원만 볼 수 있음)
문제4
The Required Breathing Zone Outdoor Airflow Vbz for a new banking facility is 0.120 CFM/ft2 (0.6 L/s/m2). If the team decides to attempt Increased Ventilation under Option 2 in the Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, what is the minimum Design Zone Outdoor Airflow?
The Required Breathing Zone Outdoor Airflow Vbz for a new banking facility is 0.120 CFM/ft2 (0.6 L/s/m2). If the team decides to attempt Increased Ventilation under Option 2 in the Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, what is the minimum Design Zone Outdoor Airflow?
정답: B
설명: (KoreaDumps 회원만 볼 수 있음)
문제5
Which of the following statements are true for Erosion and Sedimentation Control (ESC) plan prerequisite compliance?
Which of the following statements are true for Erosion and Sedimentation Control (ESC) plan prerequisite compliance?
정답: B
설명: (KoreaDumps 회원만 볼 수 있음)
문제6
Showers are addressed under which prerequisites and/or credits within LEED Building Design and Construction?
Showers are addressed under which prerequisites and/or credits within LEED Building Design and Construction?
정답: D
설명: (KoreaDumps 회원만 볼 수 있음)
문제7
What supporting material is required for all LEED Building Design and Construction projects in order to document Location and Transportation Credit, Bicycle Facilities for the bicycle network?
What supporting material is required for all LEED Building Design and Construction projects in order to document Location and Transportation Credit, Bicycle Facilities for the bicycle network?
정답: D
설명: (KoreaDumps 회원만 볼 수 있음)
문제8
How is the distance between the project site and the manufacturing location determined for Materials and Resources Credit. Building Disclosure and Optimization - Sourcing of Raw Materials. Option 2. Leadership Extraction Practices?

How is the distance between the project site and the manufacturing location determined for Materials and Resources Credit. Building Disclosure and Optimization - Sourcing of Raw Materials. Option 2. Leadership Extraction Practices?

정답: B
설명: (KoreaDumps 회원만 볼 수 있음)
문제9
SIMULATION
For a whole building energy simulation approach, what should be identical for the base building and the proposed building?
SIMULATION
For a whole building energy simulation approach, what should be identical for the base building and the proposed building?
정답: B
설명: (KoreaDumps 회원만 볼 수 있음)
문제10
Which individual occupant lighting control meets the requirements of Indoor Environmental Quality Credit, Interior Lighting?
Which individual occupant lighting control meets the requirements of Indoor Environmental Quality Credit, Interior Lighting?
정답: B
설명: (KoreaDumps 회원만 볼 수 있음)
문제11
For Location and Transportation Credit, Access to Quality Transit, a project team preparing timetables and service-level documentation must ensure the materials include
For Location and Transportation Credit, Access to Quality Transit, a project team preparing timetables and service-level documentation must ensure the materials include
정답: B
설명: (KoreaDumps 회원만 볼 수 있음)
문제12
A project in a cold climate does not want a highly reflective roof because they want the heat absorption. How can this project comply with Sustainable Sites Credit, Heat Island Reduction?
A project in a cold climate does not want a highly reflective roof because they want the heat absorption. How can this project comply with Sustainable Sites Credit, Heat Island Reduction?
정답: D
설명: (KoreaDumps 회원만 볼 수 있음)